| Total Time Since New | 1,390 Hours (as of October 2026) |
| Total Landings Since New | 817 Landings |
| Entry into Service Date | March 2021 |
| Program Coverage | Smart Parts |
| Left Engine | Right Engine | ||
| Description | Honeywell AS907-2-1A | ||
| Serial Numbers | P136885 | P136887 | |
| Total Hours Since New | 1,390 Hours | 1,390 Hours | |
| Total Cycles Since New | 823 Cycles | 822 Cycles | |
| Program Coverage | MSP | ||
| Description | Honeywell GTCP36-150(BD) |
| Serial Number | P-963 |
| APU Total Time Since New | 1,481 Hours |
| Program Coverage | MSP |
The Challenger 350 is equipped with an integrated, Collins Pro Line 21 Advanced avionics suite.
| Number of Passengers | Nine (9) + One (1) Belted Lavatory Seat |
| Galley Location | Forward |
| Fwd Cabin Configuration | Four (4) Place Executive Club |
| Aft Cabin Configuration | Two (2) Place Club Opposite Three (3) Place Divan |
| Lavatory Location | Aft Executive (Belted) |
| Base Paint Color | White |
| Tail Color | Touch of Red |
Contact Us at +1 919 941 8400 or [email protected] to request a custom range report including detailed aircraft comparisons.
| Inspection | Last Performed | Next Due |
| 12 Month | March 2026 | March 2027 |
| 24 Month | April 2025 | March 2027 |
| 36 Month | March 2024 | March 2027 |
| 48 Month | April 2025 | March 2029 |
| 96 Month | – | March 2029 |
| Service Bulletin | Description |
| SB 350-23-001 | Installation of the Dual HF Option |
| SB 350-23-003 | Installation of the 3rd VHF Communication Option |
| SB 350-23-005 | Installation of the Iridium Antenna Option |
| SB 350-23-010 | Upgrade of the Datalink System to Meet Eurocontrol’s Link2000+ |
| SB 350-23-011 | Introduction of Future Air Navigation System (FANS 1/A+) |
Please submit a request below and your local sales representative will be in touch right away.