Total Time Since New | 902 Hours (as of April 29 2025) |
Total Landings Since New | 415 Landings |
Certification Date | February 2019 |
Entry into Service Date | March 2019 |
Program Coverage | Smart Parts Preferred |
Left Engine | Right Engine | ||
Description | General Electric CF34-3B | ||
Engine Serial Numbers | 801539 | 801538 | |
Total Hours Since New | 902 Hours | 902 Hours | |
Total Cycles Since New | 427 Cycles | 430 Cycles | |
Program Coverage | GE OnPoint |
Description | Honeywell GTCP36-150 |
APU Serial Number | P-535 |
APU Total Time Since New | 1,138 Hours |
Program Coverage | Honeywell MSP Gold |
The Bombardier Challenger 650 is equipped with an integrated, Rockwell Collins Pro Line 21 Advanced avionics suite.
Number of Passengers | Ten (10) |
Galley Location | Forward |
Forward Cabin Configuration | Four (4) Place Club |
Aft Cabin Configuration | Two (2) Place Club Opposite a Four (4) Place Divan |
Lavatory Locations | Aft Executive |
Base Paint Color | Matterhorn White |
Stripes Colors | Blue and Gray |
Contact Us at +1 919 941 8400 or [email protected] to request a custom range report including detailed aircraft comparisons.
Inspection | Last Performed | Next Due |
24 Month | January 2025 | March 2027 |
36 Month | February 2025 | February 2028 |
48 Month | January 2024 | March 2027 |
96 Month | – | March 2027 |
SB650-34-010 – Introduction of the Runway Awareness and Advisory System | ||
SB650-23-008 – Future Air Navigation System (FANS) Upload of Encryption Key | ||
SB650-23-007 – Upgrade the Datalink System to Meet Link 2000+ | ||
SB650-23-002 – Installation of the Datalink System | ||
SB650-23-001 – Installation of the 3rd VHF | ||
STC ST02953NY – Installation of the Wireless Local Area Network | ||
STC ST02177LA – Installation of Head-Up Display and Enhance Vision System |
Internet | Ka-Band |
Please submit a request below and your local sales representative will be in touch right away.
Join our mailing lists. Select preferred lists